Two ways in
Caixin’s August report on the region’s AI data-centre boom put the problem in one sentence. “Data centers are voracious consumers of electricity, and the region’s limited power supply is emerging as a central constraint” (Caixin Global). The same report has global technology companies pouring billions of dollars into Southeast Asia, so the capital is arriving faster than the grids can carry the load.
My argument in this note is that the two great powers reach Southeast Asian AI through different layers of the same building. Washington reaches it through the chips inside the data centre, and since November 2026 it does so through export licences that name Malaysia, Singapore, Thailand and Indonesia. Beijing reaches it through the electricity that comes in from outside, because a growing share of the region’s transmission lines, captive power plants and solar factories were built or are owned by Chinese companies. A Southeast Asian government that wants to host AI therefore answers to one capital for its compute and depends on the other for its power, and the room it has to act lies in the rules it sets for the load itself.
Figure 1 lets you click through seven countries to see where each one gets its electricity and how fast its generation has grown since 2000 (Our World in Data).
Singapore makes about 91% of its electricity from gas
Generation almost doubled between 2000 and 2025, from 32 TWh to 60 TWh, and gas carried nearly all of that growth. Wind and solar passed 1 TWh only in 2024, so the clean power Singapore wants for its data centres has to come from abroad.
TWh per year
Coal overtook gas in Malaysia in 2016
Malaysian generation nearly tripled after 2000, to 201 TWh in 2025, and coal now supplies about 45% of it against 34% from gas. Hydropower makes up most of the rest at 18%, and this is the grid that Johor's data centres draw on.
TWh per year
Coal makes about 61% of Indonesia's electricity
Indonesia generated 372 TWh in 2024, nearly four times its output in 2000, and coal grew from 34 TWh to 228 TWh over the same period. Wind and solar together passed 1 TWh only in 2023.
TWh per year
Thailand imports a net 37 TWh of electricity a year
Gas makes about two-thirds of Thailand's electricity, and in 2025 the country also took in net imports equal to about a fifth of its own output. Wind and solar reached about 7% of generation, the second-highest share among these six countries after Vietnam.
TWh per year
Laos exports about 70% of the electricity it makes
Lao generation rose fourteenfold after 2000, to 52 TWh in 2024, and hydropower supplies about three-quarters of it. Coal arrived in 2015 and makes up the other quarter, and in 2024 the country exported a net 36.7 TWh.
TWh per year
Vietnam's electricity grew almost twelvefold after 2000
Vietnam generated 310 TWh in 2025, with coal at 48% and hydropower at 33%, and coal has been ahead of gas since 2015. Wind and solar went from almost nothing before 2019 to 12% of output.
TWh per year
Coal makes about 59% of the Philippines' electricity
Philippine generation grew about 2.7 times after 2000, to 123 TWh in 2025, and coal more than quadrupled over the same period while gas generation is no higher than it was in 2019. Coal passed gas in 2010, and wind and solar together still supply only about 4% of output.
TWh per year
Show the numbers
| Item | Value |
|---|---|
| Singapore, 2025 | hydro 0, coal 0.57, gas 54.81, wind and solar 1.64 TWh (total 60.15) |
| Malaysia, 2025 | hydro 35.24, coal 89.6, gas 67.89, wind and solar 4.51 TWh (total 201.09) |
| Indonesia, 2024 | hydro 27.29, coal 228.43, gas 68.78, wind and solar 1.82 TWh (total 371.54) |
| Thailand, 2025 | hydro 7.62, coal 33.56, gas 123.34, wind and solar 13.39 TWh (total 188.24) |
| Laos, 2024 | hydro 40, coal 12.18, gas 0, wind and solar 0.09 TWh (total 52.31) |
| Vietnam, 2025 | hydro 102.35, coal 149.24, gas 19.34, wind and solar 37.41 TWh (total 309.99) |
| Philippines, 2025 | hydro 12.7, coal 72.23, gas 21.25, wind and solar 4.46 TWh (total 123.12) |
Where the load went
Singapore stopped approving new data centres in 2019 and kept the pause in place until 2022, because the new facilities would have competed with everyone else for electricity, water and land (DCD). The demand for capacity moved across the causeway instead, and by the end of 2024 Johor held nearly 80% of Malaysia’s data-centre IT load, while Batam, an hour by ferry from Singapore, was becoming Indonesia’s second hub (TNGlobal/BMI, Ember).
Much of the demand filling those halls is Chinese. An investment analyst quoted by The Star in 2025 described Chinese companies as “the primary clients of data centres in Malaysia and other South-East Asian areas” (The Star). ByteDance is the anchor tenant at Bridge Data Centres’ campus in Sedenak, Johor, and in 2024 Malaysia’s trade minister announced a plan for a US$2.13 billion AI hub from the company, with a further US$320 million to expand its Johor facilities (DatacenterDynamics).
The IEA expects data-centre electricity demand in Southeast Asia to more than double by 2030, with Singapore and Johor driving most of it (IEA, Energy and AI). Ember’s projection for Malaysia is steeper, with data centres rising from 8.5 TWh in 2024 to 68 TWh in 2030, which would be about 30% of the country’s total demand (Ember).
Show the numbers
| Item | Value |
|---|---|
| 2024 | 8.5 TWh |
| 2030, projected | 68 TWh |
| Share of Malaysia's electricity demand in 2030 | about 30% |
The figure I find most telling is the gap between what operators have reserved and what they actually use. As of December 2024, operators in Malaysia had contracted 5.9 GW of supply and were drawing about 405 MW (Luu, SSRN). A utility has to plan for the contract, and the contract is a bet on demand that may or may not arrive.
Show the numbers
| Item | Value |
|---|---|
| Contracted | 5,900 MW |
| Drawn | 405 MW |
| Share in use | 6.9% |
The chip regime
On 16 November 2026 the US Commerce Department published rules that require a licence to export advanced AI chips to Thailand, Indonesia, Malaysia, Singapore and Brazil, on the grounds that chips sent there risk being diverted to China (Katten). The same rules require a licence when the chips will sit in a data centre that provides more than 12 million units of aggregate processing performance to companies headquartered in restricted countries, wherever that data centre is. Thai coverage expected the result to be slower and more expensive expansion for Chinese cloud providers that want to use American chips in Thailand (The Nation).
The rules land directly on the business model described above, in which Southeast Asian halls are filled by Chinese tenants running American hardware. The Diplomat has argued that ASEAN governments should treat data-centre investment as a form of AI governance and norm-setting, with full visibility into the data that flows in and out, rather than as industrial policy alone (The Diplomat). After November that advice has a second edge, because a host government that cannot see who is renting its compute also cannot show Washington that its licences are being respected.
The grid that Beijing helped build
The other layer is the electricity, and here the Chinese presence is in the physical system. Laos is the region’s hydropower exporter, and its state utility, Électricité du Laos, carries debt reported at around US$5 billion, much of it built up through Chinese lending (New Mandala). It buys electricity at an average cost of 6.2 US cents per kWh and sells it to households for about three cents, which is why the government said in 2025 that it would renegotiate its power purchase agreements (The Star). In 2020 China Southern Power Grid took 90% of a new company, EDL-T, which holds a 25-year concession to run the Lao transmission network, exports included (The Diplomat). Exports brought Laos over $2.6 billion in 2024, yet in the dry season the country still imports power because its own grid is unfinished (trade.gov).
Show the numbers
| Item | Value |
|---|---|
| Average purchase cost | 6.2¢ |
| Household price | about 3¢ |
| Gap | 3.2¢ lost on each kWh sold at home |
That network matters well beyond Laos, because it is part of how Singapore plans to keep its data centres clean. Singapore reopened to new data centres on condition that operators meet stricter green-energy criteria, and operators there now have a binding obligation to use clean energy, the first rule of its kind in the region (IMDA, Eco-Business). Since a city-state cannot generate that much clean power on its own land, it is aiming for about 6 GW of low-carbon imports by 2035, around a third of expected demand, and its first imports, which began in 2022, were Lao hydropower carried through Thailand and Malaysia (Eco-Business, ADB).
Show the numbers
| Item | Value |
|---|---|
| Today | about 200 MW |
| Target | about 6,000 MW by 2035 |
| Each square | 200 MW |
A kilowatt-hour that Singapore counts as clean can therefore come out of a power system whose state utility sells electricity at home for half of what it pays, and then cross a grid run by a Chinese state firm, which leaves the carbon credit in Singapore and the losses and the debt with the Lao utility.
Indonesia shows the same pattern in coal. The Indonesia Morowali Industrial Park in Sulawesi is a joint venture between China’s Tsingshan Group and two Indonesian partners, and it runs on about 2 GW of its own coal power. Across the nickel parks at Obi, Morowali and Weda Bay, Global Energy Monitor counts plans for 14 coal plants with a combined 12,579 MW (Dialogue Earth). Captive coal built off the national grid made up nearly 20 GW of Indonesia’s 26 GW of captive power in 2024 (Dialogue Earth, CREA/GEM). The nickel ends up in batteries and electronics, and Batam’s data-centre customers have started to ask about the coal behind its grid (Ember).
Show the numbers
| Item | Value |
|---|---|
| Coal | nearly 20 GW (77%) |
| Other sources | about 6 GW (23%) |
| Total | about 26 GW |
Even the region’s clean-energy supply chain runs through Chinese firms. Chinese solar manufacturers moved production into Southeast Asia after the first US tariffs in 2012, and in 2025 Washington imposed duties that reach about 3,500% on panels from Cambodia, Thailand, Malaysia and Vietnam, after which Chinese makers began shifting again to Indonesia and Laos (Dialogue Earth, Eco-Business, SCMP). The two regimes meet here as well, since the panels that would decarbonise the region’s data centres are made by Chinese firms and taxed by Washington.
Vietnam shows what a fragile grid costs before any of this load arrives. In May and June 2023, heat and drought emptied the reservoirs in the north and eleven hydropower plants shut down, Son La among them, taking about 5,000 MW off the grid (VnExpress). The World Bank put the cost at about $1.4 billion, 0.3% of GDP (VnExpress).
Show the numbers
| Item | Value |
|---|---|
| All of 2022 | 36 GWh |
| May–June 2023 | 900 GWh |
The revised Power Development Plan 8 responds with far more solar than the 2023 version and with higher planned imports from Laos and China (KPMG), and Decree 57/2025 opened direct power purchase agreements to data centres (Norton Rose Fulbright). A country that lost 0.3% of GDP to a single dry season is therefore inviting a kind of demand that runs at full load all year, and it plans to meet part of that demand with power bought across its northern and western borders.
What the hosting states already do
The governments in the middle have more tools than the chip-and-grid picture suggests, and the best of them sit in tariff schedules. Malaysia now separates data centres from other industrial users, so that those on the Tenaga Nasional grid pay market rates without subsidy and pay for the capacity they contracted even when they use less (w.media). That clause moves the risk of an overbuilt grid from households onto the companies that asked for the capacity. Johor has gone further on water, since the state was already rejecting about 30% of data-centre applications in 2024 (NST) and has since told investors to hold water-cooled expansions until mid-2027 (SCMP), although the federal government still refuses a national moratorium.
Thailand has taken a similar line, limiting its direct PPA pilot to data centres with a cap of 2,000 MW (Chambers) and proposing a separate data-centre tariff that reflects imported LNG and the transmission upgrades the load requires (Eco-Business). None of these rules is labelled AI policy, yet together they decide more about where AI runs in the region than any document with AI in its title.
What a verification regime would have to carry
The November rules have revived the idea that Southeast Asian governments could act as a verification layer and check, on Washington’s behalf, who rents the chips in their data centres. A Pacific Forum brief by Jin Chian Seer and Chris Chih-Hua Tseng proposes a version of this for Malaysia (Pacific Forum). The economics make it a hard request. In UN Comtrade data, every one of the ten ASEAN members trades more with China than with the United States, from Singapore at 13% of its goods trade against 10% to Laos at 34% against 2% (UN Comtrade). Vietnam’s own customs estimates for 2025 put its trade with China at about US$252 billion against about US$170 billion with the United States (Người Lao Động). The United States is the larger market for Vietnamese, Thai, Philippine, Malaysian and Cambodian exports, which is why its tariffs hurt, and in 2025 Washington set tariffs of 19% on Indonesia, Malaysia, the Philippines, Thailand and Cambodia, 20% on Vietnam and 40% on Laos (Sidley). The Book of Proverbs has a line for this kind of arithmetic, “better is a neighbour that is near than a brother far off” (Proverbs 27:10, KJV), and a government weighing a verification commitment will read it with these numbers in front of it.
Show the numbers
| Item | Value |
|---|---|
| Laos (2023) | United States 2.3% (US$0.3bn), China 33.7% (US$4.4bn) |
| Myanmar (2024) | United States 2.1% (US$0.6bn), China 27.9% (US$7.6bn) |
| Cambodia (2024) | United States 18.4% (US$10.2bn), China 27.4% (US$15.2bn) |
| Indonesia (2024) | United States 7.7% (US$38.6bn), China 27.2% (US$136.5bn) |
| Vietnam (2023) | United States 16.3% (US$110.9bn), China 25.2% (US$171.2bn) |
| Philippines (2024) | United States 10.1% (US$21bn), China 21.1% (US$44bn) |
| Thailand (2024) | United States 12.3% (US$74.5bn), China 19.1% (US$115.9bn) |
| Malaysia (2024) | United States 11.3% (US$71bn), China 16.8% (US$105.8bn) |
| Brunei (2024) | United States 2.1% (US$0.4bn), China 14.3% (US$2.7bn) |
| Singapore (2024) | United States 10.4% (US$99.8bn), China 13.2% (US$127.4bn) |
Show the numbers
| Item | Value |
|---|---|
| Laos | 40% |
| Myanmar | 40% |
| Brunei | 25% |
| Vietnam | 20% |
| Cambodia | 19% |
| Indonesia | 19% |
| Malaysia | 19% |
| Philippines | 19% |
| Thailand | 19% |
| Singapore | 10% |
Verification would also reach only half of the problem described in this note. The proposals check chips, tenants and declared uses, while the electricity behind them can run, as it does in Laos, through a transmission network operated by a Chinese state company. A regime that audits the racks and leaves the grid alone therefore secures the layer Washington controls and leaves the layer Beijing helped build outside the frame. How a regime could be designed so that host states would actually sustain it is a question I take up separately, in a note on compute verification.
What follows for middle powers
Chatham House has argued that energy may be the strongest leverage middle powers have in AI. Its authors add that a country which chooses to depend on a larger power should do so on formal terms, with monitoring and a way out, a position they call informed dependence (Chatham House). Southeast Asia already lives inside two dependencies, so the useful question is how to make both of them informed.
The place to start is the grid. When a foreign state firm runs the lines that carry power to the data centres, as China Southern Power Grid does in Laos, it has a say over where compute can be built. A transmission concession therefore deserves the same review that a chip deal gets, and the review should happen before the concession is signed. The same review can cover the chips, since a host government has to know who rents its compute to keep its licences from Washington. It also needs operating data and exit clauses in its power contracts to keep the lights on, and both obligations attach to the same building.
The region also needs more than one road for its electricity. The ASEAN Power Grid has been planned for decades and its first multilateral trade moved only 100 MW (Ember), and each new interconnector with a different mix of owners weakens the hold that any single grid operator has over the region’s data centres.
Finally, the hosting states can charge for what hosting costs. Washington and Beijing both need the region’s land, power and water, and Malaysia’s rule that operators pay for the capacity they reserve is the best piece of AI governance in Southeast Asia. I would build the playbook outward from that rule, by pricing the claim on the grid, attaching conditions to siting, and turning down a project often enough that the conditions are believed.
If Singapore’s demand keeps flowing outward, the interconnectors and the tariff schedules will decide which countries host the load and which only sell it power. I would rather those terms were set by the governments that carry the cost than by whichever capital controls the chips or owns the lines.
What I want to come back to
This note is a first pass, and I plan to come back to it. The version I have now treats each government as a single actor, when the decisions it describes are made by utilities such as Tenaga Nasional and Électricité du Laos, by a Johor state government that disagrees with Kuala Lumpur about water, and by whoever in Vientiane agreed to the EDL-T concession. I want to follow those interests more closely in the next version. I also want to separate the size of a trading relationship from the leverage it gives, since the United States buys more of what Vietnam and Cambodia make while China supplies more of what they need, which points toward hedging rather than a choice between the two.
Two other gaps stay open for now, because I have shown that a Chinese company runs part of the region’s grid without showing that the position has ever been used, and I have argued that hosting states should price their load without working out how they would avoid undercutting one another. That second problem is where ASEAN coordination would have to come in, and it is probably where the my next writing start!